01“Tenevo Solar” PV — MV/400 kV substation and 400 kV switching station
Solarpro Technology AD · 400 kV
Promenergomontazh AD · since 1964
Substations up to 400 kV, power lines and battery energy storage — from design to commissioning.
The power grid of Bulgaria
34 completed projects · 950 MW · 3.7 GWh — in Bulgaria and Romania. Tap “Brusartsi”, “Smolyan”, “Burgas” or “Tenevo” on the map for photos from the sites.
Company
Promenergomontazh AD delivers the full investment cycle — design, permitting, supply, construction and commissioning.
We work as turnkey main contractor for ESO EAD, leading independent power producers and international partners in Bulgaria and Romania. In-house design, our own production of steel structures and foundations, our own machinery.
* Completed and ongoing projects as of 2026.
The path of energy — this is what we build
Services
Step-up and interconnection substations, switchyard reconstruction and extension, control buildings and 20–33 kV switchgear.
Overhead and underground lines up to 400 kV, including interconnectors, with OPGW fibre-optic links.
BESS in single, double and quad configurations, integration with PV, wind and hydro plants, O&M.
Pyramidal F1/F2 foundations, slabs and oil-containment basins for batteries, PCS and transformers — from 3D model to installation.
From concept design to building permit, including under foreign legislation.
Service maintenance of substations, battery parks and PV plants — 24/7 response.
Also: industrial and high-rise construction, water and sewer networks, district heating networks, in-house steel structures (gantries, cable trays, lightning masts) and construction-waste recycling with permits in 14 regions.
Projects
01Solarpro Technology AD · 400 kV
02External connection only: 33/400 kV substation, 23.6 km 400 kV line and a 400 kV bay at “Mizia” substation · 400 kV
03BESS, 110/20 kV substation, 110 kV cable · 150 MW / 601.7 MWh
04At an operating wind farm · 65.55 MW / 154.77 MWh
05“Rozhen” 20/110 kV substation, 110 kV line · 320 MWh
Where we work
Our own machinery, production and crews on site — from Kavarna to Smolyan, from Kostinbrod to Burgas.
Under construction
Three large projects in Bulgaria and Romania — design, foundations, substations, lines and grid connection.
We build the external connection only: a 33/400 kV step-up substation, a 23.6 km 400 kV line and a new 400 kV bay at ESO’s “Mizia” substation.
A 33/110 kV step-up substation and battery park.
A 110 kV cable line and a new bay at an ESO substation.
Certificates and registrations
Contact
Tell us about the project — we will propose a technical solution, schedule and offer.
Send an enquiry