Promenergomontazh AD · since 1964

We build Bulgaria’s energy infrastructure.

Substations up to 400 kV, power lines and battery energy storage — from design to commissioning.

Scroll

The power grid of Bulgaria

Lighting up — place by place.

34 completed projects · 950 MW · 3.7 GWh — in Bulgaria and Romania. Tap “Brusartsi”, “Smolyan”, “Burgas” or “Tenevo” on the map for photos from the sites.

Company

Over 60 years in Bulgaria’s energy sector.

Promenergomontazh AD delivers the full investment cycle — design, permitting, supply, construction and commissioning.

We work as turnkey main contractor for ESO EAD, leading independent power producers and international partners in Bulgaria and Romania. In-house design, our own production of steel structures and foundations, our own machinery.

34Completed reference projects
950MWInstalled capacity*
3,7GWhStorage capacity*
1964Founded in Plovdiv

* Completed and ongoing projects as of 2026.

The path of energy — this is what we build

PV plant Batteries Substation 20/33/110/220/400 kV 400 kV line ESO substation

Services

Full engineering for the energy sector.

20 – 400 kV

Substations

Step-up and interconnection substations, switchyard reconstruction and extension, control buildings and 20–33 kV switchgear.

OHL · UGC · OPGW

Power lines

Overhead and underground lines up to 400 kV, including interconnectors, with OPGW fibre-optic links.

MW · MWh

Battery parks

BESS in single, double and quad configurations, integration with PV, wind and hydro plants, O&M.

F1 · F2 · OPS

Own foundations

Pyramidal F1/F2 foundations, slabs and oil-containment basins for batteries, PCS and transformers — from 3D model to installation.

BG · RO

Design and permitting

From concept design to building permit, including under foreign legislation.

Substations · BESS · PV

Maintenance and service

Service maintenance of substations, battery parks and PV plants — 24/7 response.

Also: industrial and high-rise construction, water and sewer networks, district heating networks, in-house steel structures (gantries, cable trays, lightning masts) and construction-waste recycling with permits in 14 regions.

Projects

Selected references.

All references
Substations · 400 kVMV/400 kV substation and 400 kV switching station, Tenevo01

2024 – 2025 · Tenevo

“Tenevo Solar” PV — MV/400 kV substation and 400 kV switching station

Solarpro Technology AD · 400 kV

Lines · Substations · 400 kV400 kV transmission tower02

Under construction · Gabare

Grid connection of “Gabare” PV — 400 MWp with a 1000 MWh battery

External connection only: 33/400 kV substation, 23.6 km 400 kV line and a 400 kV bay at “Mizia” substation · 400 kV

BESSBattery system, Burgas03

2025 – 2026 · Burgas

Burgas Energy Complex

BESS, 110/20 kV substation, 110 kV cable · 150 MW / 601.7 MWh

BESSBattery containers next to wind turbines, Vetrokom04

2024 – 2025 · Vetrokom

“Vetrokom” battery storage

At an operating wind farm · 65.55 MW / 154.77 MWh

Substation · Line · BESSSmolyan Energy Complex under construction05

2025 – 2026 · Smolyan

Smolyan Energy Complex

“Rozhen” 20/110 kV substation, 110 kV line · 320 MWh

Sofia Plovdiv Varna Burgas Ruse St. Zagora Tenevo Smolyan Vetrokom Kavarna Gabare Krivodol Kostinbrod Shumen HQ

Where we work

Sites across Bulgaria — and in Romania.

Our own machinery, production and crews on site — from Kavarna to Smolyan, from Kostinbrod to Burgas.

  • 17 sites in Bulgaria
  • Isalnita · RO

Under construction

Over 650 MW of new capacity — right now.

Three large projects in Bulgaria and Romania — design, foundations, substations, lines and grid connection.

Gabare · Bulgaria

Grid connection of a PV plant with a battery park

400MWp · 1000MWh

We build the external connection only: a 33/400 kV step-up substation, a 23.6 km 400 kV line and a new 400 kV bay at ESO’s “Mizia” substation.

Isalnita · Romania

Our largest battery park

158.6MW · 634.4MWh

A 33/110 kV step-up substation and battery park.

Krivodol · Bulgaria

Battery park with a 33/110 kV substation

34.5MW · 104.5MWh

A 110 kV cable line and a new bay at an ESO substation.

Certificates and registrations

  • ISO 9001:2015
  • ISO 14001:2015
  • ISO 45001:2018
  • ISO 50001:2018
  • ISO 3834-2
  • ISO/IEC 27001
  • Chamber of Builders · I – V
  • DAMTN
  • TÜV NORD · TÜV Rheinland
Clients and partnersESO EADSolarpro TechnologyEVN BulgariaERM ZapadElektrorazpredelenie YugLiebherrMETLENBTLGalabovo Solar

Contact

Let’s build your next energy project.

Tell us about the project — we will propose a technical solution, schedule and offer.

Send an enquiry
  • E-mailoffice@pem.bg
  • Phone+359 32 397 210 · +359 878 567 677
  • Address40 Kuklensko Shose St., 4004 Plovdiv, Bulgaria
  • UIC115079353