- 01
“Tenevo Solar” — MV/400 kV substation, 400 kV switching station and reconstruction of the “San Stefano” 400 kV line
Tenevo, Tundzha municipality, Yambol region
Solarpro Technology AD
Substations and switchyards
21.03.2024 – 03.07.2025400 kV
- 02
Burgas Energy Complex — BESS 150 MW / 601.7 MWh, 110/20 kV substation, 110 kV cable line
Burgas
Solarpro Technology AD
Battery parks
31.07.2025 – 13.02.2026150 MW / 601.7 MWh
- 03
Smolyan Energy Complex — “Rozhen” 20/110 kV substation, 110 kV line, BESS 320 MWh
Smolyan area
Smolyan – VE EAD
Substations and switchyards
from 16.12.2024 — completed320 MWh
- 04
New 400 kV overhead line — Lot 3, towers No. 288 – 427
—
Elektro-Konsortsium OOD
Overhead and cable lines
24.02.2020 – 22.12.2021400 kV
- 05
“Vetrokom” battery storage — 65.55 MW / 154.77 MWh, connected to an operating wind farm
—
Solarpro Technology AD
Battery parks
10.12.2024 – 25.04.202565.55 MW / 154.77 MWh
- 06
Reconstruction of the 110 kV switchyard at “Aldomirovtsi” 110/20 kV substation
—
ESO EAD
Substations and switchyards
07.07.2025 – 15.04.2026110 kV
- 07
Rooftop PV 1,132 kWp + BESS 2,120 kWh, 40 Kuklensko Shose St.
Plovdiv
Krasin OOD
PV + batteries
3 months1,132 kWp / 2,120 kWh
- 08
33 kV cable lines, internal roads and foundations for packaged transformer stations
Tenevo, Yambol region
Solarpro Technology AD
Overhead and cable lines
02.07.2024 – 02.06.202533 kV
- 09
“Kameno” 33/110 kV step-up substation, 110 kV cable and line bay
Kameno municipality, Burgas region
Sunotec (with Futura Systems)
Substations and switchyards
07.04.2025 – 23.12.202533/110 kV
- 10
“Brusartsi” 33/110 kV step-up substation and line bay in an ESO substation
Brusartsi municipality, Montana region
Sunotec (with Futura Systems)
Substations and switchyards
28.03.2025 – 23.12.202533/110 kV
- 11
Reconstruction of the 110 kV switchyard at “Zlatograd” 110/20 kV substation
—
ESO EAD
Substations and switchyards
13.10.2025 – 19.05.2026110 kV
- 12
PV 1,045 kWp + BESS 2,120 kWh
Dimitrovgrad
Simat AD
PV + batteries
2 months1,045 kWp / 2,120 kWh
- 13
New control building at Plovdiv CHP
Plovdiv
ESO EAD
Buildings and industrial
29.04.2022 – 19.10.2022Building
- 14
3 × 33 kV cable lines for PV grid connection
Galabovo / Simeonovgrad municipalities
Galabovo Solar BG EOOD
Overhead and cable lines
05.05.2023 – 01.08.202333 kV
- 15
BESS 10 MW / 40 MWh, new 20 kV cable line and fibre-optic cable
Kaliakra
Kaliakra Storage System 3 EOOD
Battery parks
09.03.2026 – 05.08.202610 MW / 40 MWh
- 16
Reconstruction of the 110 kV switchyard at “Iskar Industria” 110/20/6 kV substation
—
ESO EAD
Substations and switchyards
20.01.2023 – 09.01.2024110 kV
- 17
Construction works for installation and grid connection of a BESS
Enina, Kazanlak municipality
Solarpro Technology AD
Battery parks
18.10.2024 – 25.04.2025BESS
- 18
BESS 10 MW / 40 MWh, new 20 kV cable line and fibre-optic cable
Kavarna
Kavarna Energy System EOOD
Battery parks
09.03.2026 – 11.08.202610 MW / 40 MWh
- 19
33 kV cable line to the 33/110 kV substation of the “Karlovo” PV plant
Dabene, Karlovo municipality
Karlovo Solar BG EOOD
Overhead and cable lines
24.11.2023 – 02.04.202433 kV
- 20
Production centre, warehouse and office building — tanks / foundations stage
Plovdiv
BTL Industries AD
Buildings and industrial
10.02.2023 – 13.02.2024Industrial construction
- 21
BESS 10 MW / 40 MWh, new 20 kV cable line and fibre-optic cable
Trastikovo 1
Trastikovo Storage System 1 EOOD
Battery parks
09.03.2026 – 14.08.202610 MW / 40 MWh
- 22
BESS 10 MW / 40 MWh, new 20 kV cable line and fibre-optic cable
Trastikovo 2
Trastikovo Storage System 2 EOOD
Battery parks
09.03.2026 – 19.08.202610 MW / 40 MWh
- 23
BESS 10 MW / 40 MWh, new 20 kV cable line and fibre-optic cable
Staro Oryahovo
Oryahovo Energy System EOOD
Battery parks
09.03.2026 – 22.08.202610 MW / 40 MWh
- 24
BESS 10 MW / 40 MWh, new 20 kV cable line and fibre-optic cable
Dalgopol — Storage Park
Dalgopol Storage Park EOOD
Battery parks
09.03.2026 – 26.08.202610 MW / 40 MWh
- 25
BESS 10 MW / 40 MWh, new 20 kV cable line and fibre-optic cable
Dalgopol — Energy Park
Dalgopol Energy Park EOOD
Battery parks
09.03.2026 – 29.08.202610 MW / 40 MWh
- 26
Reconstruction of the “Obidim 1” 20 kV overhead line
Blagoevgrad region
ERM Zapad AD
Overhead and cable lines
25.05.2021 – 12.10.202120 kV
- 27
20 kV switchgear and reconstruction of the 110 kV switchyard, “Mladost” substation
—
ERM Zapad AD
Substations and switchyards
20.11.2020 – 22.12.2021110 / 20 kV
- 28
2 × transformer stations and connecting cable lines, “Hristo Botev” stadium
Plovdiv
Plovdiv Municipality
LV networks and transformer stations
16.03.2023 – 29.03.2023Transformer stations
- 29
20/20 kV switchgear and telemechanics, “Dragalevtsi Farm”
—
ERM Zapad AD
Substations and switchyards
20.11.2020 – 14.12.202120 kV
- 30
Reconstruction and new construction of LV overhead and cable networks
Montana region
ERM Zapad AD
LV networks and transformer stations
23.06.2021 – 23.12.2023LV
- 31
Repair of 20 kV bays, “Hristo Smirnenski” substation
—
ESO EAD
Substations and switchyards
22.12.2021 – 07.07.202220 kV
- 32
17.25 MW energy storage facility connected to the “Park Ramanusha” 110/33 kV substation
—
PSS Bulgaria OOD
Battery parks
04.03.2025 – 10.03.202517.25 MW
- 33
Reconstruction and new construction of LV overhead and cable networks
Razlog, Gotse Delchev, Sandanski, Petrich
ERM Zapad AD
LV networks and transformer stations
27.07.2021 – 27.01.2024LV
- 34
Internal 33 kV cable line, “Dabene” PV plant — stage 3
Dabene
Karlovo Solar BG EOOD
Overhead and cable lines
22.10.2024 – 15.12.202433 kV